CURRICULUM
The Student Impact Project curriculum spans eight weeks and guides students from design and construction to the final presentation of original to-scale model bridges.
Teams select a bridge design scenario for which they compete
to
win a "design contract." Teams design and build a
model bridge
and present their bridge design with a
written essay and oral
presentation to a panel of
judges at the end of the process.
Entries are judged
and given a cummulative score for
artistic design,
written and oral presentation, and
design integrity and solution.
BRIDGE CONSTRUCTION MATERIALS
- Foamboard
- String
- Elastic cord
- Pins (T-head and
flat head)
- Glue
- Ping pong balls
- Bricks (as anchorage or
backstay weight)
Student
Impact Project |
Participating
Schools |
Curriculum |
Volunteer
Engineers |
Media
Presentation |
|